Planroom Options

Bidroom Homepage

Public Jobs
Invitation Only Projects
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
Rebid - Wilkes County NC Airport - Parallel Taxiway Rehabilitation (20170176.00.CL)

This project will be bid with two separate schedules of work. Schedule I will include a 3-inch asphalt overlay on the existing parallel taxiway and connector taxiways with isolated areas of full depth pavement repair. The pavement will be widened at the taxiway intersections to comply with current fillet taper requirements. The existing taxiway edge lighting will be replaced with a new edge lighting system to reflect the modified pavement edges. If Schedule I is awarded, the total contract time is 120 calendar days.

Schedule II is a reduced project scope that will include a 3-inch bituminous asphalt overlay of the existing parallel taxiway and connector taxiways (approximately 7,650 tons). The project also includes the removal and replacement of a 15” RCP storm pipe under the existing parallel taxiway. If Schedule II is awarded, the total contract time is 50 calendar days.

            
You must log in to view these files.

If you do not already have an account, you can freely register for one by going here.