Smithfield, NC - Johnston Regional Airport - FBO Site Development and Parking Lot Expansion (20180257.01.RA)
The project will include removal of existing hangar buildings, demolition of existing taxilanes and utilities, construction of new vehicle parking lot with curb and gutter and area lighting, earthwork, erosion control measures, sidewalk construction, asphalt and concrete airfield ramp expansion, storm drain construction, and new utility installation. Airfield electrical items include relocation of the airfield electrical vault, relocation of the rotating beacon, re-routing of the airfield home run cables to the new vault, apron light pole installation, and emergency generator for the airfield electrical vault.