Onslow County, NC - ONWASA NRWRF Hurricane Florence Response Flood Mitigation Measures (20200007.00.CL)

Northwest Regional Water Reclamation Facility Hurricane Florence Response Flood Mitigation Measures will be performed in two (2) divisions as summarized below:

1. Division 1 – Proposed Flood Mitigation Measures

a. All work necessary to build new, flood resistant, precast building around the transfer pumps and SBR blowers at plant locations 240 and 280, as described in the specifications and drawings (DI 227282-1).

b. All work necessary to build new, flood resistant, precast building around the Sludge Digester Blower Systems at plant location 680, as described in the specifications and drawings (DI 227282-4).

c. Installation of raised steel platforms for the effluent pump controls at location 500 (DI 227284) and the infiltration pump station located south of the main plant (DI 227286).

d. Installation of raised steel platforms to elevate the motors and associated disconnects, and conversion of pumps and motors for elevated belt or chain driving at locations 200 (SBR Jet Motive Pumps) (DI 227282-2). and 350 (Post EQ Pump System) (DI 227282-3).

e. Installation of Administration flood protection door barriers.

f. Installation of seals for all electrical and instrument conduit seals that are located at or below the flood event elevation shown in the drawings (DI 227288).

2. Division 2 – Proposed Electrical Structure

a. Installation of new electrical structure and associated foundations, electrical components and rewiring (DI 227288) as described in the specifications and drawings.

b. Installation of new plant-wide transformer, transformer foundation and associated wiring from the transformer (DI 227288). Contractor shall coordinate directly with the utility (Jones-Onslow Electric Membership Corporation) regarding the identification, procurement, installation and connection of the new plant transformer on the foundation design in this project.

c. Elevation of the existing large backup generator and associate re-wiring (DI 227288).

d. Repair or replacement of all the existing equipment that is a part of the original SCADA system to provide a complete and fully operable system. The Contractor shall also provide all software, programming, operating systems, network interface, special drivers and network integrations required and shall perform all configurations, commissioning, troubleshooting, and diagnostics required for a complete and functional system.
             
  
Sorted By Company
Click on the following links to sort by a category
Company | CSI Codes | Contact Name  | Date | Bid Category
Loading...    Refreshing . . .
Printer Friendly Version



  Plan Holder List for 'Onslow County, NC - ONWASA NRWRF Hurricane Florence Response Flood Mitigation Measures (20200007.00.CL)'
  Company Information    CSI Codes  Contact Information  Status
Date Filled
Date Returned  
Delivery Method  
Tracking Number  
  ConstructConnect  
  30 Technology Parkway South  
  Suite 100  
  Norcross, GA 30092  
00013 - Other  
Morgan Stinson  
Phone: (800) 364-2059  
Fax: (866) 570-8187  
Filled  
11/25/2020  

Download - N/A (Downloads or Other)  

  Enviro-Tech Unlimited Construction Services LLC  
  PO Box 157  
  Nags Head, NC 27959  
00002 - General Contractor  
Nick Brown  
Phone: (252) 491-5277  
Fax: (252) 491-5777  
Filled  
12/08/2020  

Download - N/A (Downloads or Other)  

  Excel Contractors, LLC  
  8641 United Plaza Blvd  
  Baton Rouge, LA 70809  
00002 - General Contractor  
Nate Dronette  
Phone: (225) 408-1300  
Fax: (225) 408-1600  
Filled  
12/02/2020  

Download - N/A (Downloads or Other)  

  Kiewit Infrastructure South Co.  
  450 Dividend Dr  
  Peachtree City , GA 30269  
00002 - General Contractor  
Tina Chism  
Phone: (770) 487-2300  
Fax: (770) 487-0005  
Filled  
12/01/2020  

Download - N/A (Downloads or Other)  

  Muter Construction L.L.C.  
  111 E. Vance Street  
  27258, NC 27597  
00002 - General Contractor  
Damon Jones  
Phone: (919) 404-8330  
Fax: (919) 400-4253  
Filled  
11/30/2020  

Download - N/A (Downloads or Other)