Summerville, SC RFP - Sawmill Branch Water Supply - Booster Pumping and Storage Improvements

The Summerville Commissioners of Public Works (SCPW) is seeking properly licensed and qualified contractors to submit proposals for the opportunity to serve as Construction Manager At-Risk (CMAR) for preconstruction services and potential construction services for a project at their potable water supply connection to the Santee Cooper Regional Water System (SCRWS). The “Project” will consist of two (2) 1.0-million-gallon ground storage tanks (GST) and associated yard piping; a booster pump station (BPS) and associated equipment; a 30-inch supply main from the SCRWS meter to the new GST and BPS site; a 30-inch transmission main parallel to an existing 24-inch transmission main into the SCPW water system; demolition of the existing 150,000-gallon Coastal elevated storage tank; and the addition of two (2) check valve vaults and one (1) control valve vault on the distribution lines associated with the North elevated storage tank. The objective of this Request for Proposals (RFP) is to provide additional information to enable Offerors to submit written proposals for the project. Offerors must submit two (2) hard copies of their proposal as well as one (1) USB thumb drive containing a single PDF copy of their proposal.
            

 

    

Contact:   Tiffany King
PreBid Date:   09/21/2022 01:00 PM
PreBid Info:   Prospective Offerors are strongly encouraged to attend the non-mandatory pre-proposal meeting at the SCPW Main Office, located at 215 N. Cedar Street, Summerville, SC 29483.

Company:   W. K. Dickson & Co. Inc.
Bid Date:   10/14/2022 02:00 PM
Bid Info:   Proposals must be received by Summerville Commissioners of Public Works, Attn: Micah Miley, PE, 215 N. Cedar Street, Summerville, SC 29483

Project Location: Summerville, SC

Public Notes:
For information regarding this project please contact:

Walt Fletcher
W.K. Dickson & Co., Inc.
162 Seven Farms Drive, Suite 210, Charleston, SC 29492
Phone: 843-416-5560 x15
Email: wfletcher@wkdickson.com

The proposed project has an estimated cost of $11,887,520.00

All questions will be due by 5:00 pm on October 6, 2022.

SCPW intends to select the CMAR for the Project based on review and evaluation of the Proposals and shortlist interviews.

Offerors are encouraged to provide input on the overall project schedule and provide suggested improvements to reduce the construction schedule. The preliminary project schedule is as follows:

MILESTONE ACTIVITY – TENTATIVE SCHEDULE & DATE

Advertise CMAR selection process 09/14/2022
Pre-proposal meeting 09/21/2022
Questions due to Engineer 10/06/2022
CMAR proposals due 10/14/2022
Shortlist Interviews 10/20/2022
CMAR selection / Pre-construction services 10/21/2022
Obtain Final Permits – Final Design 02/08/2023
CMAR Construction services - sub-contractor selection 03/01/2023
Start Construction 04/01/2023
Construction Completion 06/01/2024
Grants / Funding Closeout 07/01/2024

Proposals will be evaluated in accordance with the selection criteria in Sections 6 and 7.



Job Purchase Information:
RFP Closed