Sevierville, TN - 36-Inch Sanitary Sewer Interceptor Rehab (20210730.00.KV)

The work to be performed under this Contract shall consist of furnishing all labor, materials, tools, equipment, and incidentals and performing all work required to construct complete in place and ready to operate the following:

1. Rehabilitate 19,347 linear feet of 36-inch Ductile Iron Pipe Gravity Sewer Interceptor Main using Cured-In-Place-Pipe.
2. Install primary and secondary bypass pumping and piping system to divert flow from upstream sewer to Davis Lane Pump Station or to bypass connection at Davis Lane Pump Station.
3. Perform Level C subsurface manhole rehabilitation on forty-eight (48) manholes along the 36-inch gravity sewer interceptor main.
4. Perform surface manhole rehabilitation including replacement of frame and cover on forty-eight (48) manholes along the 36-inch gravity sewer interceptor main.
The work will be awarded in one Contract.

The HUSA Sonar reference files from April 2021 are available HERE PLEASE BE ADVISED THIS IS AN ENORMOUS FILE AND MAY TAKE OVER AN HOUR TO DOWNLOAD.

The Record Drawings for reference are available HERE.
            
You must log in to view these files.