REBID - Conover, NC - NEWWTP Aeration System Upgrade (20180256.00.HI)
NEWWTP Aeration System Improvements, including but not limited to:
1) Upgrade of the existing sequencing batch reactor (SBR) aeration system with work to be performed separately in a pair of basins while maintaining the remaining pair of basins in operation;
2) Upgrade of the existing Blower Building and air distribution system for the SBRs;
3) SCADA system modifications required improvement to monitor and control various features of the new SBR control system provided by the SBR manufacturer; and
4) Site work, yard piping and erosion control as outlined by the drawings and all other work as described by Contract Documents.
Engineer’s Cost Estimate: $4,459,000