Greensboro, NC - Piedmont Triad International Airport - Triturator Replacement (20220629.00.RA)

This project consists of demolition of an existing 20’x10’ block storage building, demolition of 450 SY of existing concrete ramp, and backfill and abandonment of an existing oil/water separator. Project will also include construction of a pre-engineered canopy, construction of approximately 370 SY of concrete pavement, replacement of an existing grinder pump system, including associated plumbing and electrical work, and other incidental items necessary to complete the project.
You need to register or login to view files and more project information.

Status

Bidding Closed

Prebid Date7/15/24 11:00am

Bid Date7/24/24 2:00pm

Company & Contacts

WK Dickson & Co., Inc.
Kristel Weldon  

Location

Greensboro, NC

For information regarding this project please contact:

Brigid Williams
W.K. Dickson & Co., Inc.

bwilliams@wkdickson.com

Bid Security equal to 5% of the total Bid is required in the form of a cash deposit or a Bid Bond. Contract Security in the form of 100% Performance and Payment Bonds will be required. No Bid may be withdrawn after closing time for the receipt of Bids for a period of ninety (90) consecutive calendar days.

Each Bidder shall be prequalified as a “Bidder” or “POC Prime Contractor” by North Carolina Department of Transportation at the time the bid is submitted. Any subcontractors shall be prequalified by North Carolina Department of Transportation prior to start of work on the project. Each Bidder must be properly licensed under Chapter 87, General Statutes of North Carolina (G.S. 87-15). Each Bidder shall certify, by submission of a proposal, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency or the State of North Carolina.

 

The Piedmont Triad Airport Authority reserves the right to waive any informalities or irregularities in or to reject any or all Bids and to award or refrain from awarding the Contract for the work, whichever is deemed to be in the Authority’s best interest.