Laurinburg-Maxton (NC) Airport - T-Hangar & Taxilane – Ph2 and Perimeter Fencing (20230838.00.CL)
Schedule I - The project scope will include the construction of one, 10-unit T-Hangar building with associated taxilanes and auto access. Site preparation will include around 4,000 cubic yards of grading, about 775 linear feet of storm drain pipe, about 1,200 tons of asphalt paving, and utility services for the new hangar building (water, sewer, electric). Schedule II - The project scope will include the construction of two, 10-unit T-Hangar buildings with associated taxilanes and auto access. Site preparation will include around 4,500 cubic yards of grading, about 900 linear feet of storm drain pipe, about 1,800 tons of asphalt paving, and utility services for the new hangar buildings (water, sewer, electric). Schedule III - The project scope will include the construction of two, 10-unit T-Hangar buildings with associated taxilanes and auto access and an apron rehabilitation. Site preparation will include around 5,300 cubic yards of grading, about 850 linear feet of storm drain pipe, about 3,000 tons of asphalt paving, and utility services for the new hangar buildings (water, sewer, electric).
You need to register or login to view files and more project information.
Addendum #1
(click to expand/collapse)

Name | Size | ||
Addendum #1 | 4.0 MB | ||
SOW MEB T-Hangar Ph.2 20230838.00.CL (Contractor Version).xls | 150.5 KB |
Addendum #2
(click to expand/collapse)

Name | Size | ||
Addendum #2 | 261.4 KB |
Addendum #3
(click to expand/collapse)

Name | Size | ||
2025-05-30 MEB T-Hangars Add 3 | 70.3 KB | ||
SOW.xls | 146.5 KB |