North Charleston, SC - Mulberry and Powerhouse Pump Station Upgrades (20240394.00.WK)

The Mulberry and Powerhouse Pump Stations are being upgraded with the intent of replacing aged equipment, adding standby generators, and installation of new electrical equipment, controls, and generator on new raised platforms to flood-proof the pump stations. The project will include construction of the raised concrete platform, installation of Owner-provided generators, pump controls, and electrical equipment. Owner-provided new or refurbished pumps will be installed in each station. New stainless-steel piping will be installed in each station, each wet well will be thoroughly cleaned and the Mulberry Pump Station wet well will be structurally rehabilitated. Site improvements will include asphalt paving and new fencing at the Powerhouse Pump Station.