Hilton Head, SC - WWTP Influent Pump Station Improvements (20250065.00.WK)

The work will consist of the following: Base Bid: Demolition and construction of improvements to the existing Influent Pump Station Building, removal and replacement of three (3) Evoqua screw lift pumps with new Evoqua equipment, building ventilation improvements, electrical and SCADA modifications, and associated appurtenances as shown in the Plans and Specifications. Alternate Bid No. 1: Removal and replacement of three (3) Evoqua screw lift pumps with new Lakeside equipment, modification of concrete supports and associated work as shown in the Plans and Specifications. Alternate Bid No. 2: Removal and replacement of the two (2) Motor Control Centers (MCCs) in the existing Influent Pump Station Building as shown in the Plans and Specifications.
You need to register or login to view files and more project information.
Addendum #1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum #1 14.3 MB