Surf City, NC - Roland Avenue Infiltration Project (20240575.00.WK)

Construction of proposed permeable pavers at the intersection of Roland Avenue and South Shore Drive, which will reduce flooding on South Shore Drive. The proposed infiltration system includes approximately 43 linear feet of 12” Class V RCP (Reinforced Concrete Pipe), 116 LF of 6” PVC (Polyvinyl Chloride), one (1) traffic bearing drop inlet (TBDI), approximately 442 square yards of permeable pavers, traffic control, and erosion control.
You need to register or login to view files and more project information.

Status

Accepting Bids

Prebid Date 11/4/25 3:00pm
Bid Date 11/14/25 11:00am

Company & Contacts

WK Dickson & Co., LLC.
Kristel Weldon  

Location

Surf City, NC

For information regarding this project please contact:

Michael Tassitono, PE, PH

Mtassitino@ardurra.com

Ardurra

Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis as indicated in the Bid Form. The Owner reserves the right to reject any and all bids.

The Project has an expected duration of: 90 days to Substantial Completion and 120 days to Final Completion.

For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.