Lenoir (NC) Fire Department Infrastructure Repair (20230663.00.RA)

The Project includes the following Work: The project will replace and re-align approximately 420 linear feet of 42-inch corrugated metal pipe (CMP) with 42” Reinforced concrete pipe (RCP) along with 6 drainage structures. Over the last several years, a sinkhole has appeared in the greenspace between the fire department and Ridge Street NW above the 42-inch CMP pipe system. The CMP storm drainage system from West Avenue NW to Ridge Street NW is in a state of failure. This project will abandon approximately 210 linear feet of existing 42-inch CMP in place, replace or relocate approximately 271 linear feet of 8” Ductile Iron Pipe (DIP) sanitary sewer along with 3 sanitary sewer manholes, and miscellaneous grading to repair the sinkhole. Foundation protection will be installed on the north side of the fire department building. The existing storm drainage and sanitary sewer systems are 25 ft and 30 ft deep, respectively, and special consideration will need to be taken to provide sheeting/shoring during construction. Utility coordination, traffic control, erosion control, and site improvements are also included within the scope of this project.
You need to register or login to view files and more project information.

Status

Bidding Closed

Prebid Date5/28/24 10:00am

Bid Date6/25/24 10:00am

Company & Contacts

WK Dickson & Co., Inc.
Kristel Weldon  

Location

Lenoir, NC

For information regarding this project please contact:

Marc T. Horstman
W.K. Dickson & Co., Inc.

mhorstman@wkdickson.com

Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis as indicated in the Bid Form. The Owner reserves the right to reject any and all bids.

The Project has an expected duration of 304 days.