Georgetown, SC - Rural Community Water District - Brick Chimney Road Well (20230825.00.CH)

The work will consist of the construction of a new groundwater well on a 1-acre site on Brick Chimney Road with supporting equipment to support drilling to the Charleston Aquifer at an approximate depth of 1,200 feet. The well will include a pump capable of delivering 500 GPM and be supported by Variable Frequency Drive controllers, asphalt and gravel access, associated drainage, site fencing, piping, valves, electrical and SCADA/Control system, and appurtenances as well as a chlorination system housed in a prefabricated concrete building. The well will connect to the existing 10” waterline along Brick Chimney Road.
You need to register or login to view files and more project information.
Addendum #1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum #1 491.7 KB
Addendum #2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum #2 195.5 KB