Georgetown, SC - Rural Community Water District - Brick Chimney Road Well (20230825.00.CH)

The work will consist of the construction of a new groundwater well on a 1-acre site on Brick Chimney Road with supporting equipment to support drilling to the Charleston Aquifer at an approximate depth of 1,200 feet. The well will include a pump capable of delivering 500 GPM and be supported by Variable Frequency Drive controllers, asphalt and gravel access, associated drainage, site fencing, piping, valves, electrical and SCADA/Control system, and appurtenances as well as a chlorination system housed in a prefabricated concrete building. The well will connect to the existing 10” waterline along Brick Chimney Road.
You need to register or login to view files and more project information.
Bid Set (click to expand/collapse)